Having carried out successful tank lining and refurbishing projects for a London school, we were re-commissioned to reline three galvanised steel cold water storage tanks located above the school sports centre.

Challenges

  • All three tanks revealed deep craters in the steel, which left untreated would have caused leaks.
  • The building was in constant use so work had to be carried out swiftly within the half term break.
  • The tanks were located within a small void in the roof and accessed via a small doorway hatch.
  • Some tanks were coated with the original black bitumen, which was failing.
  • Replacing three tanks would have required the removal of the roof and crane hire; a costly, time consuming and disruptive alternative.
  • Before tank lining treatment and craters in the tank floor

    Our Solution

    To avoid the unnecessary and expensive replacement of three water storage tanks, we recommended the use of our potable water tank lining system. Our in-situ water tank lining system was specifically developed for the refurbishment or repair of tanks located in difficult to reach areas, such as attic voids and roof spaces. By using this innovative solution, each tank could be quickly and conveniently reconditioned to the required standard with minimum disruption to the school’s activities.
    Following extensive blast cleaning and application of an anti-corrosion primer, we repaired the floors of the tanks with our resin screed system, which in effect built new floors within the tanks.

    After water tank lining treatment

    Results

    Our water tank lining system again proved to be less intrusive and more cost effective than replacing the tanks. Even with the additional work of applying the floor screed to each tank, the project was successfully completed on time and within budget. This refurbishment project will extend the practical working life of each tank for a further fifteen to twenty years.